Global Data House

EPC contractor · AI data centres · Europe

We build the halls where intelligence runs.

Engineering, procurement and construction for 80–130 kW racks — substation, liquid loop, white space and commissioning under a single contract. Four European campuses, 210 MW in design.

ISO 27001 & 45001 workflowsFIDIC contract frameworkRegistered in London
AI data hall with liquid-cooled racks
Reference design · 130 kW direct-to-chip hall, 1.12 design PUE
845 MW
Total pipeline, delivered and in build
450k+
Accelerators housed
130 kW
Per-rack liquid density
1.12
Design PUE

Four campuses in design

One disclaimer for the whole section. Stage is visible from the badge and the build bar, so no reader has to hunt for it.

All project detail →
Luleå Aurora site exterior

Luleå Aurora

Luleå, Sweden · target 2027
Under construction
60 MW facility50 MW ITPUE 1.20
Foundation and 130 kV substation complete

32,768 H200 GPUs · hydro-backed PPA · 10 MWth district heat export

Frankfurt Main Compute site exterior

Frankfurt Main Compute

Frankfurt, Germany · target 2026
Commissioning
48 MW facility40 MW ITPUE 1.20
Rack energization in progress

24,576 H200 GPUs · 110 kV intake · 800G training fabric

Reykjanes Basalt site exterior

Reykjanes Basalt

Reykjanes, Iceland · target 2028
Engineering
30 MW facility25 MW ITPUE 1.20
Feasibility and seismic review

4,000 SHA-256 ASICs · immersion pods · 4,096 H200 AI wing

Aragon Ebro Training site exterior

Aragon Ebro Training

Aragon, Spain · target 2028
Engineering
72 MW facility60 MW ITPUE 1.20
Grid access not yet secured

32,768 H200 GPUs · 220 kV substation · closed-loop cooling

Campus figures are illustrative design scenarios, not verified as-built records. Capacities and target years are planning assumptions.

One contract, three scopes

Single-point responsibility from feasibility to handover. Scope boundaries are defined before signature, not negotiated after.

E

Engineering

Design authority for the whole facility, from load study to permit pack.

  • Concept and detailed design
  • Power system and load studies
  • CFD and thermal modelling
  • Substation and HV design, 110–220 kV
  • Permitting and planning submissions
  • BIM to LOD 400
P

Procurement

Long-lead strategy and vendor management, run through our own supplier portal.

  • Long-lead equipment strategy
  • CDU and dry-cooler packages
  • Switchgear and transformers
  • Generator sets and UPS
  • Vendor qualification and audit
  • Factory acceptance testing
C

Construction

Self-delivered civils and M&E with phased energization by hall.

  • Civil and structural works
  • White space fit-out
  • Pipework and liquid loop installation
  • Electrical installation and terminations
  • Integrated systems testing
  • Commissioning to handover

What we design for

Reference parameters our designs are built around. Everything is sized to the cluster you actually intend to run.

Rack density

80–130 kW per rack, direct-to-chip and single-phase immersion. Rear-door and air for legacy halls.

Power

110–220 kV intake, N+1 topology, on-site generation, PPA structuring support.

Cooling

Closed-loop dry rejection, warm-water loops, heat-pump-ready returns, no routine evaporative water.

Network

800G training fabric, structured cabling, DCI paths, meet-me-room build.

Heat reuse

District and process heat export design, 3–10 MWth per campus, offtake negotiation support.

Compliance

ISO 27001 and 45001 workflows, FIDIC contracts, CDM dutyholder roles, independent commissioning witness.

From feasibility to handover

Indicative durations for a greenfield 50 MW hall. Phased so racks energize before full completion.

01

Feasibility

4–8 weeks. Site options, power and cooling routes, order-of-magnitude cost, grid enquiries.

02

Design

4–7 months. Detailed design, permits, long-lead procurement release, BIM coordination.

03

Build

14–24 months. Civil, M&E and fit-out, phased by hall with partial energization.

04

Commission

8–12 weeks. Integrated systems testing, load bank, PUE verification, O&M handover.

Supply the next European campus

Bid, follow purchase orders and submit invoices in one workspace — no email chains.

ReferencePackageClosesCategory
RFQ-2026-041CDU packages · 4 × 1.2 MW direct-to-chip12 Nov 2026Cooling
RFQ-2026-038130 kV substation transformer and switchgear5 Nov 2026Electrical
RFQ-2026-035Dry coolers · 18 MW heat rejection29 Oct 2026Mechanical
RFQ-2026-033800G training fabric, structured cabling22 Oct 2026Networking

Sample package list. Approved suppliers see full specs, drawings, quantities and submission deadlines inside the workspace.

Send us your cluster spec

Goes straight to our procurement team. Expect a named reply from an engineer, not a sales queue.

Registered office
78 St. James's Street
London SW1A 1EJ
United Kingdom
Telephone
+44 7451 253178
Email
procurement@gdhsystems.com