
Luleå Aurora
32,768 H200 GPUs · hydro-backed PPA · 10 MWth district heat export
EPC contractor · AI data centres · Europe
Engineering, procurement and construction for 80–130 kW racks — substation, liquid loop, white space and commissioning under a single contract. Four European campuses, 210 MW in design.

One disclaimer for the whole section. Stage is visible from the badge and the build bar, so no reader has to hunt for it.

32,768 H200 GPUs · hydro-backed PPA · 10 MWth district heat export

24,576 H200 GPUs · 110 kV intake · 800G training fabric

4,000 SHA-256 ASICs · immersion pods · 4,096 H200 AI wing

32,768 H200 GPUs · 220 kV substation · closed-loop cooling
Campus figures are illustrative design scenarios, not verified as-built records. Capacities and target years are planning assumptions.
Single-point responsibility from feasibility to handover. Scope boundaries are defined before signature, not negotiated after.
Design authority for the whole facility, from load study to permit pack.
Long-lead strategy and vendor management, run through our own supplier portal.
Self-delivered civils and M&E with phased energization by hall.
Reference parameters our designs are built around. Everything is sized to the cluster you actually intend to run.
80–130 kW per rack, direct-to-chip and single-phase immersion. Rear-door and air for legacy halls.
110–220 kV intake, N+1 topology, on-site generation, PPA structuring support.
Closed-loop dry rejection, warm-water loops, heat-pump-ready returns, no routine evaporative water.
800G training fabric, structured cabling, DCI paths, meet-me-room build.
District and process heat export design, 3–10 MWth per campus, offtake negotiation support.
ISO 27001 and 45001 workflows, FIDIC contracts, CDM dutyholder roles, independent commissioning witness.
Indicative durations for a greenfield 50 MW hall. Phased so racks energize before full completion.
4–8 weeks. Site options, power and cooling routes, order-of-magnitude cost, grid enquiries.
4–7 months. Detailed design, permits, long-lead procurement release, BIM coordination.
14–24 months. Civil, M&E and fit-out, phased by hall with partial energization.
8–12 weeks. Integrated systems testing, load bank, PUE verification, O&M handover.
Bid, follow purchase orders and submit invoices in one workspace — no email chains.
Sample package list. Approved suppliers see full specs, drawings, quantities and submission deadlines inside the workspace.
Goes straight to our procurement team. Expect a named reply from an engineer, not a sales queue.